Civil works
Overall Project / Works:
- Location of Works: Sapa Town, Sa Pa District, Lao Cai.
- Scale works: The building has 8 floors (2 basements, 6 floors), 16,000 m2 floor, versatile and complex architecture.
- Investor: Sun Group.
- Total investment: 4.000.000 million VND.
Range of Ngoc Xanh construction:
- Scope of the tender package: Construction of complete items Terminal (Building, tile, lacquer, ceiling gypsum ...).
- Value of the tender package: February 2015 - January 2016.
- Construction time: 37.356 million VND.
Overall Project / Works:
- Location of Works: 98 To Ngoc Van - Quang An - Tay Ho - HN.
- Scale works: The building has 3 blocks 3 floors, 4,360 m2 floor, 1,600 m2 yard. The building used as an international school from kindergarten to high school.
- Investor: Bilingual International School Horizon.
- Total investment: 21.000 million VND.
Range of Ngoc Xanh construction:
- Scope of the tender package: All three main floors and infrastructure, surrounding yard.
- Value of the tender package: March 2013 - May 2013 and December 2013 - April 2014.
- Construction time: 16.046 million VND.
Overall Project / Works:
- Location of Works: Buoi Ward - Tay Ho - Hanoi.
- Scale works: The project has 9 floors (01 basement, 08 floors) 4,050 m2 floor, works used as offices for rent.
- Investor: South Pacific Joint Stock Company.
- Total investment: 23.500 million VND.
Range of Ngoc Xanh construction:
- Scope of the tender package: Renovate and complete the interior of the project.
- Value of the tender package: 11.540 million VND.
- Construction time: April 2012 - December 2012.
Overall Project / Works:
- Location of Works: Sapa Town, Sa Pa District, Lao Cai.
- Scale works: Total area of 4,012 m2, floor area of 17,218 m2, height of 7 floors (01 basement + 06 floors). Structural steel for post-tensioning.
- Investor: Ha Son Tourist Transport Joint Stock Company.
- Total investment: 160.200 million VND.
Range of Ngoc Xanh construction:
- Scope of the tender package: Construction of the foundation, the rough construction.
- Value of the tender package: 59.424 million VND.
- Construction time: October 2016 - February 2018.
Overall Project / Works:
- Location of Works: Bo De Ward - Long Bien - Hanoi.
- Scale works: Total area of the land is 42,000 m2, 128 adjacent adjacent to the height of 6-7 floors.
- Investor: Plastic Chemical Joint Stock Company.
- Total investment: 1.145.000 million VND.
Range of Ngoc Xanh construction:
- Scope of the tender package: Construction of the foundation, rough and finishing the surface.
- Value of the tender package: 101.278 million VND.
- Construction time: November 2017 - October 2018.
Overall Project / Works:
- Location of Works: : Cat Hai District- Hai Phong City.
- Scale works: Total area of 20,44 ha; including Terminal station, parking are, cable system. Will become the longest and biggest cable system in the work after completion.
- Investor: Sun Group.
- Total investment: 3 billion USD.
Range of Ngoc Xanh construction:
- Scope of the tender package: Structure and plastering work at Phu Long station.
- Value of the tender package: 25.021 billion VND.
- Construction time: April 2019 - August 2019.
Overall Project / Works:
- Location of Works: : Cau May street, Sapa town, Sapa district, Lao Cai.
- Scale works: Total area of 7,514 m2 with construction site area of 5,655 m2, included 04 floors and 0-2 basements, located at Cau May street, with unique designing of IndoChina style, this project is indeed the spotlight of Sapa tourism.
- Investor: Sun Group.
- Total investment: 250,000 million dongs.
Range of Ngoc Xanh construction:
- Phạm vi gói thầu: Thi công kết cấu bê tông cốt thép Block C,D
- Giá trị gói thầu: 23.885 triệu đồng.
- Thời gian thực hiện: Tháng 10/2019 - Tháng 3/2020.